Meter technology

With the counting technology available in the eibabo online shop, you always have an overview of the most varied consumption and power consumption times. With an operating hours counter, you can measure how long a machine or an entire system has been running since it was commissioned. An electricity meter measures the electricity that a machine or an entire household has consumed within a certain period of time. These devices can be configured very differently and, in addition to classic alternating current, also include three-phase or direct current, depending on the model. A maximum monitor always has an eye on the current consumption of a system and compares it to a previously set maximum target consumption. If necessary, it switches off electrical consumers so that the maximum target consumption is not exceeded.



 
With the counting technology available in the eibabo online shop, you always have an overview of the most varied consumption and power consumption times. With an operating hours counter, you can... read more »
Close window
Meter technology

With the counting technology available in the eibabo online shop, you always have an overview of the most varied consumption and power consumption times. With an operating hours counter, you can measure how long a machine or an entire system has been running since it was commissioned. An electricity meter measures the electricity that a machine or an entire household has consumed within a certain period of time. These devices can be configured very differently and, in addition to classic alternating current, also include three-phase or direct current, depending on the model. A maximum monitor always has an eye on the current consumption of a system and compares it to a previously set maximum target consumption. If necessary, it switches off electrical consumers so that the maximum target consumption is not exceeded.

Close filters
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
from to

1 From 23
No results were found for the filter!
RECOMMENDED
3D
Lingg & Janke - EZ-EMU-DSTD-D-REG-FW - KNX energy meter, 3ph, standard EZ-EMU-DSTD-D-REG-FW
¥1,591.75 excl. VAT

*

plus shipping
(¥2,012.32 RRP***)
KNX energy meter, 3ph, standard
Lingg & Janke
| EZ-EMU-DSTD-D-REG-FW
RECOMMENDED
3D
Eltako - DSZ15D-3x80A MID - Three-phase meter MID, calibrated - Direct kilowatt-hour meter 10A DSZ15D-3x80A MID
¥683.68 excl. VAT

*

plus shipping
(¥1,011.93 RRP***)
Three-phase meter MID, calibrated - Direct kilowatt-hour meter 10A
Eltako
| DSZ15D-3x80A MID
RECOMMENDED
3D
Eltako - WSZ15D-32A MID - AC meter MID, 32A - Direct kilowatt-hour meter 5A WSZ15D-32A MID
¥304.80 excl. VAT

*

plus shipping
(¥453.67 RRP***)
AC meter MID, 32A - Direct kilowatt-hour meter 5A
Eltako
| WSZ15D-32A MID
RECOMMENDED
3D
Eltako - DSZ15DM-3x80A MID - Three-phase meter M-Bus - Direct kilowatt-hour meter 10A DSZ15DM-3x80A MID
¥1,152.43 excl. VAT

*

plus shipping
(¥1,650.24 RRP***)
Three-phase meter M-Bus - Direct kilowatt-hour meter 10A
Eltako
| DSZ15DM-3x80A MID
RECOMMENDED
3D
ABB - B23 111-100 - Three-phase meter - Direct kilowatt-hour meter 5A B23 111-100
¥981.42 excl. VAT

*

plus shipping
(¥1,673.33 RRP***)
Three-phase meter - Direct kilowatt-hour meter 5A
ABB
| B23 111-100
RECOMMENDED
3D
RECOMMENDED
3D
Eltako - DSZ15DE-3x80A - Three-phase meter - Direct kilowatt-hour meter 10A DSZ15DE-3x80A
¥486.78 excl. VAT

*

plus shipping
(¥720.54 RRP***)
Three-phase meter - Direct kilowatt-hour meter 10A
Eltako
| DSZ15DE-3x80A
RECOMMENDED
3D
Energy meter 1-phase direct 40A, 1M - Direct kilowatt-hour meter 40A ECN140D
¥358.97 excl. VAT

*

plus shipping
(¥689.53 RRP***)
Energy meter 1-phase direct 40A, 1M - Direct kilowatt-hour meter 40A
Hager
| ECN140D
RECOMMENDED
3D
Eltako - DSZ14DRS-3x80A MID - Three-phase meter RS485 bus radio - Direct kilowatt-hour meter 10A DSZ14DRS-3x80A MID
¥908.57 excl. VAT

*

plus shipping
(¥1,287.45 RRP***)
Three-phase meter RS485 bus radio - Direct kilowatt-hour meter 10A
Eltako
| DSZ14DRS-3x80A MID
RECOMMENDED
3D
Eltako - DSZ15WD-3x5A MID - Converter three-phase meter MID - Transformer kilowatt-hour meter 5A DSZ15WD-3x5A MID
¥933.74 excl. VAT

*

plus shipping
(¥1,381.94 RRP***)
Converter three-phase meter MID - Transformer kilowatt-hour meter 5A
Eltako
| DSZ15WD-3x5A MID
RECOMMENDED
3D
ABB - B23 113-100 - Three-phase meter M-Bus - Direct kilowatt-hour meter 5A B23 113-100
¥1,205.59 excl. VAT

*

plus shipping
(¥2,055.59 RRP***)
Three-phase meter M-Bus - Direct kilowatt-hour meter 5A
ABB
| B23 113-100
RECOMMENDED
3D
Finder - 7E.46.8.400.0012 - Three-phase meter 3Ph. - Direct kilowatt-hour meter 10A 7E.46.8.400.0012
¥954.59 excl. VAT

*

plus shipping
(¥1,786.85 RRP***)
Three-phase meter 3Ph. - Direct kilowatt-hour meter 10A
Finder
| 7E.46.8.400.0012
1 From 23
Viewed from you